ADI Size Change Requirements
Per Board Order, dated April 26, 2023, the 10% or 25 kW limit for increasing the size of the solar facility referenced in your initial ADI registration packet has been increased to 20% or 25 kW, whichever is less. Solar facilities that submit their post construction packet prior to May 3, 2023, (effective date of the Board Order) and move their ADI registration status to Final As-Built Received, will be subject to the 10% or 25% increase requirements.
The ADI Program allows solar systems to be increased in size by up to 10% or 25 kW (dc), whichever is smaller, from the original system size proposed in the initial ADI Registration Packet. Solar facilities cannot increase their system more than 10% or 25kW (dc) and cannot increase the system capacity by any amount that would expand the project beyond 5 MW (dc). Solar facilities can decrease in size from the initial registration submitted with no restrictions.